Electric stripper overview:
It is used for the demoulding of round test specimens of various soils and mixtures, especially for the demoulding requirements of cement mixture strength test pieces, and its large load can reach 150KN.
Preparing for electric ejection device operation
(1) The stripper should be placed on a solid concrete floor.
(2) Turn on the 380V power supply, and pull the motor switch to make the “release screw†move up and down (motor switch, the middle is the stop position, left and right are the rising and falling positions respectively). Note that the limit position of the screw movement is the top of the screw. With the horizontal horizontal position on the top plate, the limit of the screw movement is 20 mm above the upper plane of the screw.
(3) Select the appropriate "positioning plate" and "support plate" position.
The “release stripping plate†is used to determine the positioning reference of the upper end when the specimen is demolded. The “support plate†is the positioning reference for determining the lower end of the specimen when demolding. When the specimen is demolded, the appropriate “positioning plate should be selected. "And determine the proper "support plate" position to ensure the correctness of the test piece during the demolding process.
a. Decompression test mode diameter 150 test piece and heavy-duty compaction diameter 152 test piece should be selected as the diameter 154 "positioning plate".
b. Decompression test mode diameter 100 specimens Heavy-duty compaction diameter 100 specimens and Marshall specimens should be selected with a diameter of 104 "positioning plate".
c. Decompression test mode diameter 50 test piece should be selected as the diameter of 54 "positioning plate".
To adjust the position of the fixed "support plate", the positioning screws should be aligned and fastened with the opposite arc groove "positioning groove" on the two columns, and the positions of I, II, III and IV are divided into four positions from bottom to top.
When the decompression test mode diameter 150 test piece is used, the "support plate" should be fixed at the "positioning groove" position I (ie, under zui)
At the end position, the decompression test mode diameter 100 test piece and the heavy-duty compaction diameter 152 test piece should be fixed at the "support plate"
At the position of the groove "II." Decompression test mode diameter 50 test piece and weight (light-weight compaction diameter 100 test piece, the "support plate" should be fixed at the position of "positioning groove" III).
When removing the Marshall test piece, the "support plate" should be fixed at the "positioning groove" IV position.
When adjusting the "support plate", first loosen the "fastening screw" (two pieces) on the "support plate", then loosen the "positioning screw", adjust the "support plate" to the desired position, first set the positioning screw Tighten and secure the two fastening screws.
Electric stripper operation process
Place the test piece on the support plate at the adjusted position and align it with the recess. Put down the “release stripping plate†(the method is to rotate the “fixed block†by 90 degrees respectively, so that the “release stripping plate†is separated from the “fixed block†and the support slides down along the “guide axis†on the test mold. Hebei Dahong Experimental Instrument Co., Ltd., a supplier of “release stripping plateâ€, slides up and down freely: it does not interfere with the “fixed blockâ€, and cuts the concave table of the “positioning plate†to test the die. When the motor is turned on to raise the "release screw", the test piece can be taken out (note: in the case of the 50-diameter compression test piece, the length of the 130 mm "extension shaft" must be inserted into the upper end hole of the "release screw". In the diameter 152, the diameter of 100 compaction cylinder. 100 compression test and Marshall test mold must be inserted into the upper end of the mold release screw 55 mm long shaft, in the de-diameter 150 compression test mode does not use "extended The shaft ") reversely drives the motor to "make the stripper screw" down to the original position (note: the lower end limit position is "the tip of the stripper screw" is 20 mm from the upper end of the box), the test mold is removed, and the work is completed once.
Hose Reel Cart,Portable Hose Reel Cart,Commercial Hose Reel Cart,Industrial Hose Reel Cart
NINGBO QIKAI ENVIRONMENTAL TECHNOLOGY CO.,LTD , https://www.water-hose-reel.com