2. After the crusher is installed, check the tightening conditions of the fasteners. If loose, tighten them.
3. To check whether the tightness of the belt is proper, whether the motor shaft and the shredder axis are parallel.
4. Before starting the crusher, first turn the rotor by hand to check whether the claws, hammers and rotors are flexible and reliable. There is no collision phenomenon in the shell. Whether the rotation of the rotor is consistent with the direction indicated by the arrow on the machine, the motor and the powder The lubrication of the machine is good.
5. Do not easily replace the pulley to prevent the speed of the crushing chamber from exploding, or the speed is too low to affect the work efficiency.
6. After the crusher starts, it will idle for 2 minutes to 3 minutes. No abnormal phenomenon will occur after the crusher starts.
7. Always pay attention to the operation of the pulverizer during work and feed it evenly to prevent obstruction of boring cars. Do not overload for a long time. If there is vibration, noise, high temperature of the bearing and the body, spraying of material outside, etc., it is necessary to immediately stop the inspection and remove the fault before continuing to work.
8. The crushed material should be carefully inspected to avoid accidents such as copper, iron, stone and other hard objects entering the crushing room.
9. The operator should not wear gloves, and should stand on the side of the grinder when feeding so as to prevent rebounding debris from injuring the face.
10. Forbidden to feed or withdraw feed by hand or wooden stick when jammed.
Anesthesia Medical Co., Ltd. , https://www.jssinoanesthesia.com